4.5 Object Schedule


User could put the process objects on the object schedule to make a manufacture sequence. M83 could execute it and store it to a portable file.



Rotate the knob or touch to select the schedule item.

Select a schedule item and press key 1, the object selecting dialog (A, B, C...) will pop up.

Object selecting dialog.

Rotate the knob or touch to select object.

Press key 1 to confirm the selection. N/A means not applicable, it could clear current item or all schedule. If other object code is selected, an entity selecting dialog (1, 2, 3, 4) will appear.

Press key 2 to quit this operation.

The operation of entity selecting dialog is the same as the object selecting dialog. Once the operation is done, the object schedule item will be filled in with object code and entity number.

If you want to execute it after editing the object schedule, touch "RUN" icon. M83 will check whether the parameters of each object in the schedule are correct or not before executing the object schedule. If it is correct, a confirm window will pop up.

Program executing confirm window.

Press key 1 to confirm.

Press key 2 to quit this operation.

If key 1 is pressed and the currently selected item is not the first item, a "Run from?" dialog will pop up.

Knob rotating or touch could do the selection.

Press key 1 to confirm.

Press key 2 to quit.

If there is any inappropriate parameters has been checked out, a warning window will pop up with the name of the incorrect object. User must check the object again and modify it before executing the process.


Note:

It is okay to have some 0 (N/A) items between two non-zero items. M83 will skip it automatically.